Modular production hall
- Location
- Factory, China
- Business line
- Modular Housing
- Application
- Manufacturing
- Delivery form
- Steel-frame and container lines
01Requirement
What the site needed
Several unit types share the hall, so frames, openings and services had to stay identical across batches without slowing the line.
Blue steel-frame modules move through welding, glazing and fit-out bays under a 40-tonne gantry.
02Configuration
Unit list
Reference quantities. Final scope follows the approved project schedule.
| Unit | Qty | Note |
|---|---|---|
| Frame line | 1 | Jigs for 20ft and 40ft |
| Glazing bay | 1 | Panel setting and sealing |
| Fit-out bay | 2 | Electrical, wet pod and finishes |
03Delivery
Delivery notes
01
Gantry handling
Modules lifted between bays without re-rigging.
02
Batch control
Frame, panel and service kits released together.
03
Pre-dispatch check
Dimensions, openings and protection settings recorded.