Liquid-cooled AI hall, Texas
Data CentersScene reference

Liquid-cooled AI hall, Texas

Location
Texas, United States
Business line
Data Centers
Application
AI training capacity
Delivery form
6 compute cabins + CDU plant
01Requirement

What the site needed

The operator had a power allocation and a lease but no hall ready for high-density GPU racks, and the cooling plant had to be added in phases.

A liquid-cooled cabin hall assembled beside an existing shell building.

02Configuration

Unit list

Reference quantities. Final scope follows the approved project schedule.

UnitQtyNote
40ft compute cabin62.4 MW reference each, cold plate ready
In-row CDU62.4 MW, dual pump, N+1
Dry cooler bank41600 kW each at 5 °C approach
Power cabin2MV/LV, UPS and battery racks
03Delivery

Delivery notes

01

Staged cooling

CDU and dry cooler capacity followed the rack install schedule.

02

Factory fit-out

Rack rows, manifolds and leak detection installed before dispatch.

03

Loop commissioning

Flush, pressure test and load bank before handover.