01Requirement
What the site needed
The operator had a power allocation and a lease but no hall ready for high-density GPU racks, and the cooling plant had to be added in phases.
A liquid-cooled cabin hall assembled beside an existing shell building.
02Configuration
Unit list
Reference quantities. Final scope follows the approved project schedule.
| Unit | Qty | Note |
|---|---|---|
| 40ft compute cabin | 6 | 2.4 MW reference each, cold plate ready |
| In-row CDU | 6 | 2.4 MW, dual pump, N+1 |
| Dry cooler bank | 4 | 1600 kW each at 5 °C approach |
| Power cabin | 2 | MV/LV, UPS and battery racks |
03Delivery
Delivery notes
01
Staged cooling
CDU and dry cooler capacity followed the rack install schedule.
02
Factory fit-out
Rack rows, manifolds and leak detection installed before dispatch.
03
Loop commissioning
Flush, pressure test and load bank before handover.
04Site gallery
Images
Discuss a similar project
Send the site and the requirement. We will propose the unit mix.