Crane-set module installation
Modular HousingScene reference

Crane-set module installation

Location
Reference site
Business line
Modular Housing
Application
Installation & logistics
Delivery form
40ft modules / 60t crane
01Requirement

What the site needed

The site had limited laydown space and a short weather window, so each unit had to be lifted, aligned and released without double handling.

Complete modules lifted from road trailers onto prepared pads and connected in sequence.

02Configuration

Unit list

Reference quantities. Final scope follows the approved project schedule.

UnitQtyNote
Lifting frame1 setFour-point sling, rated for 40ft
Module set18Office and welfare units
Site crew6Rigging, alignment and connection
03Delivery

Delivery notes

01

Lift plan

Crane position, radius and ground bearing checked before arrival.

02

Pad tolerance

Pads set to level so modules land without packing.

03

Interface close-out

Power, water and data linked and tested the same day.

04Site gallery

Images

Discuss a similar project

Send the site and the requirement. We will propose the unit mix.