Data CentersScene reference
Cooling skid production batch
- Location
- Factory, China
- Business line
- Data Centers
- Application
- Cooling systems
- Delivery form
- Skid-mounted CDU / pump sets
01Requirement
What the site needed
The cooling package had to arrive as a tested skid, with pipe routes matching the cabin headers and no site welding.
Stainless pipework, pumps, valves and instrumentation assembled and pressure-tested on skid frames.
02Configuration
Unit list
Reference quantities. Final scope follows the approved project schedule.
| Unit | Qty | Note |
|---|---|---|
| Pump skid | 2 | Duty and standby |
| Heat exchanger | 1 | Plate type, isolation valves |
| Control panel | 1 | Sensors and BMS interface |
03Delivery
Delivery notes
01
Skid assembly
Pipe spools, pumps and valves aligned on one frame.
02
Pressure test
Hydrostatic test and flush before instrumentation is set.
03
Delivery protection
Flanges capped and skid braced for sea freight.
04Site gallery
Images
Discuss a similar project
Send the site and the requirement. We will propose the unit mix.