Cooling skid production batch
Data CentersScene reference

Cooling skid production batch

Location
Factory, China
Business line
Data Centers
Application
Cooling systems
Delivery form
Skid-mounted CDU / pump sets
01Requirement

What the site needed

The cooling package had to arrive as a tested skid, with pipe routes matching the cabin headers and no site welding.

Stainless pipework, pumps, valves and instrumentation assembled and pressure-tested on skid frames.

02Configuration

Unit list

Reference quantities. Final scope follows the approved project schedule.

UnitQtyNote
Pump skid2Duty and standby
Heat exchanger1Plate type, isolation valves
Control panel1Sensors and BMS interface
03Delivery

Delivery notes

01

Skid assembly

Pipe spools, pumps and valves aligned on one frame.

02

Pressure test

Hydrostatic test and flush before instrumentation is set.

03

Delivery protection

Flanges capped and skid braced for sea freight.